Garden & OutdoorLast reviewed: November 2026

Gravel Driveway Calculator

A gravel driveway calculator works out how much gravel you need for a driveway — the crushed-stone tonnage and truckloads for a new or resurfaced driveway. Enter length, width and depth, and it models the three-layer system — #3 ballast, crusher run and top dressing — with a 10% compaction allowance for heavy vehicle traffic.

Key facts:
  • A 60 by 12 ft driveway at 4 inches needs about 13.7 tons.
  • New driveways need 8 to 12 inches of stone in three layers.
  • Crown the centre 1/4 to 1/2 inch per foot of width.
  • Allow 10% extra for compaction under vehicles.

Loading calculator…

Measurements in imperial units (ft, in, sq ft, cu yd, lb, gal). Switch units in the header — values convert, the calculation stays the same.

Share or Export Current Results

Share Gravel Driveway Calculator directly or copy link to clipboard

TwitterLinkedInFacebookWhatsApp

Calculation Formula & Mathematical Engine

Theoretical equation governing this computation.

Driveway_{tons} = \frac{Length_{ft} \times Width_{ft} \times (Depth_{in}/12)}{27} \times 1.40 \times 1.10

Variable Definitions

Driveway_{tons}Total gravel tonnage ordered
1.1010% compaction allowance under heavy vehicle roll-in
Depth_{in}Standard 4" resurfacing or 8-12" for new driveway excavation

Step-by-Step Calculation Example

60ft × 12ft Rural Driveway Resurfacing at 4" Depth

Scenario: Spreading a 4-inch layer of dense grade aggregate over an existing driveway.
Driveway Length60 ft
Driveway Width12 ft
Depth4 inches
Execution Steps
  1. 1Square footage: 60 × 12 = 720 sq ft
  2. 2Volume in cubic yards: 720 × (4/12) ÷ 27 × 1.10 = 9.78 cu yds
  3. 3Tonnage: 9.78 × 1.40 = 13.7 tons (two tri-axle dump truck loads at ~12 tons each)
Final Verified Output:13.7 Tons Crushed Stone (2 Tri-Axle Dump Truck Loads)

Comprehensive Practical Guide

In-depth analysis, domain guidelines, standard practices, and common pitfalls.

The 3-Layer Driveway Construction System

Long-lasting gravel driveways feature three tiers: a 4-6" sub-base of heavy #3 crushed stone over geotextile fabric, a 4" middle layer of #57 stone, and a 2" top crown of crusher run with stone dust.

How Thick Should a New Gravel Driveway Be?

A new driveway needs 8 to 12 inches of stone in total: 4 to 6 inches of #3 ballast over geotextile fabric, 4 inches of #57 stone, and a 2-inch top layer of crusher run. A resurfacing job over a sound existing base needs only 4 inches of fresh top stone. Always crown the surface so water runs off to the sides instead of pooling in wheel ruts.

How Much Gravel for a 10x20 Driveway?

A 10 by 20 ft driveway at 4 inches deep needs 2.72 cubic yards of crushed stone, or about 3.8 tons — one tri-axle truckload. The volume is 10 × 20 × (4 ÷ 12) = 66.67 cubic feet, times the 10% compaction allowance and divided by 27 cubic feet per cubic yard gives 2.72 cubic yards, and at 1.40 tons per cubic yard that is 3.80 tons. At 3 inches deep the same driveway needs only 2.04 cubic yards, or about 2.85 tons. Enter your own length, width and depth in the calculator above for an exact order.

Frequently Asked Questions About Gravel Driveway Calculator

Direct, verified answers to common calculation and methodology questions.

It depends on the size and depth. A 60 by 12 ft driveway at 4 inches deep needs about 13.7 tons, and a 10 by 20 ft driveway at the same depth needs about 3.8 tons (2.72 cubic yards). A new driveway needs 8 to 12 inches of stone, so it takes two to three times as much as a 4-inch resurfacing job.
Authoritative Sources & Data References:
  • Federal Highway Administration (FHWA) Gravel Roads Maintenance Manual

Disclaimer: Crown slopes must be maintained to prevent vehicle rutting.